daewoo Solar 140LC-V — Change Swing Reduction Device Oil

1,000 HOUR / 6 MONTH SERVICE PERFORM ALL DAILY, 50, 250 AND 500 HOUR SERVICE CHECKS GREASE SWING REDUCTION DEVICE 1. Lower front attachment to the ground. 2. Remove air vent plug (Figure 66) from swing reduction device. Figure 66 3. Press grease fitting and inject grease with the grease gun on the marked point. (Figure 67) 4. Reinstall air vent plug on swing reduction device. Figure 67 CHANGE SWING REDUCTION DEVICE OIL NOTE: Change swing reduction device oil after first 250 hours on a new machine and every 1,000 hours thereafter. WARNING! The gear oil is very hot after the machine has been operating. Shut all systems down and allow them to cool. Figure 68 1. Set a container under excavator.

2. Open drain plug (Figure 68). NOTE: Dispose of drained fluids according to local regulation. 3. After draining oil close drain plug. 022-00058E Operation and Maintenance Manual Inspection, Maintenance and Adjustment 4-39