Section 8 Electrical System and Components Figure 8-41. Installing Brush Holder Assembly Using Tool with Extension. Figure 8-43. Torquing Brush Holder Screws. 11. Install the end cap onto the armature and frame, aligning the thin raised rib in the end cap with the corresponding slot in the grommet of the positive (+) brush lead. 13. Hook the plunger behind the upper end of the drive lever, and install the spring into the solenoid. Insert the three mounting screws through the holes in the drive end cap. Use these to hold the solenoid gasket in position, then mount the solenoid. Torque the screws to 4.0-6.0 N·m (35-53 in. lb.) . 12.
Install the two thru bolts, and the two brush holder mounting screws. Torque the thru bolts to 5.6-9.0 N·m (49-79 in. lb.) . Torque the brush holder mounting screws to 2.5-3.3 N·m (22-29 in. lb.) . See Figures 8-42 and 8-43. 14. Connect the positive (+) brush lead/bracket to the solenoid and secure with the hex nut. Torque the nut to 8-11 N·m (71-97 in. lb.) . Do not overtighten. See Figure 8-44. Figure 8-42. Torquing Thru Bolts. Figure 8-44. Positive (+) Brush Lead Connection. 8.20