Aegis LH630-775 — Section 8 - Electrical System

Section 8 Electrical System and Components Solenoid Test Procedure 12 volt Test Leads Momentary Connection Only Solenoid Shift Style Starters Disconnect all leads from the solenoid including the positive brush lead attached to the lower stud terminal. Remove the mounting hardware and separate the solenoid from the starter for testing. VOM Leads Test 1. Solenoid Pull-In Coil/Plunger Actuation Test. Use a 12 volt power supply and two test leads. Connect one lead to the flat spade “S/start” terminal on the solenoid. Momentarily* connect the other lead to the lower large post terminal. See Figure 8-45.

When the connection is made the solenoid should energize (audible click), and the plunger retract. Repeat the test several times. If the solenoid fails to activate, it should be replaced. Figure 8-46. Testing Pull-In Coil/Solenoid Contact Continuity. Test 3. Solenoid Hold-In Coil Function Test. Connect one 12 volt test lead to the flat spade “S/ start” terminal on the solenoid, and the other lead to the body or mounting surface of the solenoid. Then, manually push the plunger “In” and check if the “Hold-In” coil holds the plunger retracted. See Figure 8-47. Do not allow the test leads to remain connected to the solenoid for a prolonged period of time.

If the plunger fails to stay retracted, the solenoid should be replaced. *NOTE: DO NOT leave the 12 volt test leads connected to the solenoid for any time over what is necessary for performing each of the individual tests. Internal damage to the solenoid may otherwise occur. 12 volt Test Leads Momentary Connection Only Figure 8-45. Testing Pull-In Coil/Plunger Actuation. Test 2. Solenoid Pull-In Coil/Contact Continuity Test. Use an ohmmeter set to the audible or Rx2K scale, and connect the two ohmmeter leads to the two large post terminals. Perform the preceding test (1) and check for continuity. See Figure 8-46.

The ohmmeter should indicate continuity, if no continuity is indicated the solenoid should be replaced. Repeat test several times to confirm condition. Figure 8-47. Testing Hold-In Coil/Function Test. 8.21 8 Manually Push Plunger “In” 12 volt Test Leads Connect Only Long Enough to Test