Section 8 Electrical System and Components Test 4. Solenoid Hold-In Coil/Contact Continuity Test. Use an ohmmeter set to the audible or Rx2K scale, and connect the two ohmmeter leads to the two large post terminals. Perform the preceding test (3) and check for continuity. See Figure 8-48. The meter should indicate continuity, if no continuity is indicated the solenoid should be replaced. Repeat test several times to confirm condition. VOM Meter Leads Plunger Pushed “In” Figure 8-48. Testing Hold-In Coil/Solenoid Contact Continuity. 12 volt Test Leads 8.22