Section 11 Reassembly 5. Using a light, visually check that sufficient clearance exists between the cooling system components and bottom of flywheel. See Figure 11-71. If clearance is OK, continue with installation of ignition modules. If clearance is insufficient or contact is noted, remove the flywheel and adjust as required. Reinstall the flywheel and recheck for adequate clearance. Figure 11-72. Torquing/Setting Ignition Module Gap. 6. Repeat steps 3 to 5 for the other ignition module. 7. Rotate the flywheel back and forth checking for clearance between the magnet and ignition modules. Make sure the magnet does not strike the modules.
Recheck the gap with a feeler gauge and readjust if necessary. Final air gap: 0.203/0.305 mm (0.008/0.012 in.) . Figure 11-71. Clearance Check/Verification. 8. Connect the kill leads to the ignition modules. Route the wiring harness and kill leads as shown in Figures 11-73 and 11-74. Push (bend) the loop portion of the clamp on the #1 side back, as far as possible, for maximum clearance from fan. Install Ignition Modules 1. Rotate the flywheel magnet away from the ignition module mounting bosses. 2. Install the two ignition modules, with the ground terminal "out", onto the crankcase mounting bosses, using the four hex flange screws.
Slide the ignition modules away from the flywheel as far as possible, and tighten the four screws. 3. Rotate the flywheel to position the magnet directly under one of the ignition modules. 4. Insert a 0.25 mm (0.010 in.) flat feeler gauge or shim stock between the magnet and ignition module. Loosen the hex flange screws enough to allow the magnet to pull the module against the feeler gauge. Figure 11-73. By-pass Hose and Wiring Routed within Cutout of Intake Manifold (Some Models). 5. Torque the two hex flange screws to 4.0 N·m (35 in. lb.) . See Figure 11-72. 11.21 11