Freightliner — FLA COE, FLB COE, FLC112 Conventional, FLD Conventional, FLL COE

Electrical, Instruments, and Controls 54 6 5 7 1 8 6 2 9 4 5 10 11 3 08/24/93 f540610a 2 3 4 1 2 13 12 1. Air/Oil Junction Block 2. Electrical Mounting Plate 3. Circuit Breaker Bus Bar 4. Four-Position Junction Block 5. Two-Position Junction Block 6. Relays 14 10/20/93 f540630 Fig. 3, FLB Electrical Mounting Plate 1. Bunk Harness Connectors 2. Cable Tie Plate 3. Main Cab-Ground Stud (Black) 4. Seven-Way Receptacle Harness Connector 5. Right-Hand Tunnel Side 6. Electrical Mounting Plate (end view) 7. Dash Support Bracket (end view) 8. Daytime Running Lights Module 9. Cab-to-Chassis and Cab-to-Engine Harness Interface Connectors 10. Bulkhead Support Bracket 11. Main Cab-Power Stud (Red) 12.

Main Cab Harness 13. Main Engine Harness 14. Right-Hand Cab Deck For an FLD, uncover the electrical mounting plate by removing the access panel from the dash skirt under the center section of the dash. The panel is attached to the skirt by three quarter-turn fasteners. For an FLC (RH DR), uncover the main cab connec- tors and studs by removing the left-hand under-dash cover. See Fig. 9 . Uncover the electrical panel by removing the glove box on the left side of the dash. To remove the glove box, open the glove box door and remove the six screws from the glove box liner. See Fig. 12 . Then, remove the glove box door and the glove box liner from the dash. This will expose the electrical panel.

See Fig. 8 . Check all wiring for chafing, kinks, and discolored insulation. Find the cause of any problems, then re- pair, replace, or reroute wires as needed. Fig. 4, FLB Main Cab Harness Connectors Cab Exterior Check that all relays are firmly seated in their mount- ing plates. For an FLC, check the 40-way connector on the fire- wall (left side for a RH DR vehicle and right side for a LH DR vehicle), and check the power and ground studs. Check the terminals for tightness, damage, corrosion, and dirt. See Fig. 13 (LH DR) or Fig. 14 (RH DR). Chassis Check the tightness of the connections on the electri- cal junction block(s), main cab-power stud, and cab- ground stud, as equipped.

Tighten the fasteners to the torque values in Table 1 . Install all of the removed panels. 1. Check the main chassis wiring harness. Check the wiring insulation for damage from chafing or Heavy-Duty Trucks Maintenance Manual, April 1998 54/2