Exhaust 49 1 1 2 3 4 5 6 5 3 7 8 9 3 10 02/24/2011 f490456 1. Clamp 2. Inlet Pipe 3. U-Clamp 4. Forward Pipe-Support Brace 5. Slip Clamp 6. CGI Bellows 7. Center Pipe-Support Brace 8. Center Pipe 9. Clamp 10. Outlet Pipe Fig. 9, CAT EPA07 Exhaust Installation with CGI Bellows NOTICE 1 2 When shortening the CGI pipe(s), it is critical to leave a minimum of 1 inch (25.4 mm) of straight pipe on the end of each CGI pipe to allow for pipe insertion and clamp clearance. Failure to do this could result in an exhaust leak, which in this case may allow ingestion of contaminants into the en- gine causing engine damage. A 7.
Once the pipes are aligned, measure the pipe gap between the CGI pipes and record the dis- tance. See Fig. 10 , Ref. A. The existing pipe gap is designed at 10 inches (254 mm). A 10.75 inches (273 mm) pipe gap is required for the replacement CGI bellows and clamps. This requires one or both of the CGI pipes to be shortened. 02/23/2011 f490457 A. Measure the pipe gap. 1. CGI Aft Pipe 2. CGI Forward Pipe Fig. 10, Measuring the Pipe Gap (typical) 8. Using a yellow paint pen, mark the pipes 1.5 inches (38 mm) in from the end of each pipe. These two marks will be used to center the bel- lows between the two pipes. 11.
Slide the slip clamp, with the retaining ring and graphite gasket ring, on the aft CGI pipe. See Fig. 11 for proper installation. 9. Once the pipes are correctly aligned and sepa- rated at the correct distance, secure the aft CGI pipe to the ATD and to any CGI pipe support brackets. 12. Slide the new bellows onto the aft CGI pipe as far as it will go. See Fig. 12 , Ref. A. Measure- ment A should be at least 7/16 inch (10 mm) past the face of the flange. 13. Install the slip clamp with the retaining ring and graphite gasket ring onto the forward CGI pipe. See Fig. 13 for proper installation. 10. Remove the forward CGI pipe from the truck. Western Star Maintenance Manual, September 2015 49/8