Mitsubishi — 15. INJECTION NOZZLE

4M41 ENGINE - Injection Nozzle 11B-15-7 (5) Connect the special tool Pin to the special tool Dial Gauge. 157892-7200 157954-3801 (6) Fit the special tool Dial Gauge onto the nozzle holder 25 and secure it with the special tool Nut in such a manner that the special tool Pin contacts the upper end of the spring seat 22 . 157954-3801 C 157892-1000 Caution 1. Secure the special tool Dial Gauge so that a stroke of 2 mm or so can be measured. 2. Do not overtighten the special tool Nut. If it is too tight, the shaft C of the special tool Dial Gauge may be stuck. 25 157892-7200 22 4ME0525 B (7) Attach the nozzle holder 25 to the nozzle tester B , then zero the special tool Dial Gauge.

(8) Loosen the special tool Plug, then operate the nozzle tester B to bleed all air out of the special tool Retaining Nut (for adjustment). Check for fuel leakage at the same time. 157954-3801 25 157892-5100 157892-1600 4ME0526 (9) Using the nozzle tester, increase the pipe pressure up to somewhere between 34.3 and 44.1 MPa to make the needle valve 13 lift to the full level. Record the dial gauge reading D of full lift. D Needle valve lift (mm) Standard value: 0.23 - 0.27 mm Caution This check is necessary to determine if the seat of the nozzle tip 12 is abnormally worn. 0 1st valve opening pressure Pipe pressure (MPa) 34.3 - 44.1 PWEE9409-D E Feb. 2000 Mitsubishi Motors Corporation Added