Mitsubishi — 15. INJECTION NOZZLE

4M41 ENGINE - Injection Nozzle 11B-15-8 CHECKING PRELIFT (1) With the needle valve 13 fully lifted, release the handle of the nozzle tester B . This causes the pipe pressure to decrease with a concomitant drop in dial gauge reading (needle valve lift). D F Needle valve lift (mm) E (2) Read the dial gauge when the 2nd spring 19 has stopped acting, or when the needle valve 13 has stopped lowering (at prelift level E ), and ascertain that the reading is within the specified limits of standard value. D : Amount of needle valve full lift 0 1st valve opening pressure Pipe pressure (MPa) Standard value:

0.05 - 0.07 mm (3) Read the dial gauge with the needle valve 13 at the prelift measuring point F (1st valve opening pressure + approx. 1 MPa). (Observe the dial gauge while lowering the pressure.) 14 (4) If the dial gauge reading deviates from the specified limits of standard value, replace the pin 14 , lift piece 16 , spacer 15 , nozzle tip 12 and needle valve 13 with a Nozzle Service Kit. 16 15 13 G : Capsule (Zexel part No. 105019-1240) G 12 Standard value: 0.05 - 0.07 mm 4ME0529 157954-3801 H ADJUSTING 2ND VALVE OPENING PRESSURE (1) After checking the prelift, operate the nozzle tester B and increase the pipe pressure to 34.3 - 44.1 MPa so that the needle valve lifts fully.

(2) Release the handle of the nozzle tester B . The pipe pressure will lower with a concomitant drop in dial gauge reading (needle valve lift). B 4ME0530 PWEE9409-D E Feb. 2000 Mitsubishi Motors Corporation Added