OPERATING MACHINE Operating Backhoe Select an arm and bucket whose specifications match the working conditions. (Refer to “Bucket Types and Applications” in the specification chapter.) Pull the bucket toward the machine using the arm as the main digging force. When soil sticks to the bucket, remove it by moving the arm and/or bucket rapidly back and forth a few times. While facing the bucket tooth tip toward the direction of excavation as straight as possible, excavate the ground with the teeth penetrating shallowly using the arm and bucket cylinder full strokes. Position the tracks parallel to the trench. After digging to the desired depth, move the machine backward to continue the trench.
Operate each cylinder with a slight allowance left at both stroke ends. IMPORTANT: • Do not dig the ground in the diagonal direction toward the track frame. Failure to do so may cause the bucket teeth to come into contact with the crawler. • When lowering the boom, avoid sudden stops that may create shock load damage to the machine. Always smoothly lower the boom so that shock loads may not be created. • When digging deep below the ground level, be careful not to allow boom cylinder, boom bottom, and/or bucket cylinder hoses to come into contact with the ground. • When digging with the blade positioned towards the front or when digging at an angle, avoid hitting the blade.
• When the bucket load is dumped with the boom raised, falling material may hit the base machine and/or the canopy. Always be aware of loads in the bucket during operation. 5-11