hitachi — Hitachi ZX14-3/ZX16-3/ZX18-3/ZX27-3 Hydraulic Excavator Operator's Manual

MAINTENANCE 5 Check Track Sag (Steel Crawler) (Optional) (ZX27-3 Only) --- every 50 working hours Proper adjustment of track sag is vital to extending the service life of the track and travel device. Check Track Sag 90 to 110 ° As illustrated to the right, raise the one side track, which sag is measured, off the ground. Place blocks under machine frame to support the machine. M1M7-04-006 f NOTE: 1. Check track sag after thoroughly removing soil stuck on track area by pressure washing. 2. When operating the machine on ground such as mud or gravel, these materials may easily become packed into the undercarriage, adjust the track sag so that it is slightly loose.

A M588-07-062 Adjusting Track Sag 1. If track sag is not within specifications, loosen or tighten the track following the procedures shown on the next page. 2. When adjusting track sag, lower the bucket to the ground to raise one track off the ground. Repeat this procedure to raise the other track. Every time, be sure to place blocks under machine frame to support the machine. 3. After adjusting track sag of both tracks, move the machine back and forth several times to equalize the track sag on both side tracks. 4. After doing so, check track sag again. If track sag is not within specifications, repeat adjustment until the correct sag is obtained.

7-71 Dimension Track Sag Specifications A in mm (in) ZX27-3 110 to 130 (4.3 to 5.1)