TESTING AND ADJUSTING MEASURING WORK EQUIPMENT MEASURING WORK EQUIPMENT i Measurement conditions C Engine water temperature: Within green range on engine water temperature gauge C Hydraulic oil temperature: 45 - 55 E C (113 - 131 E F) C Engine speed: High idling C Steering position: Neutral C No load Measurement method 1 . Boom RAISE time Set the bucket at the lowest position from the ground with the bucket tilted back fully, then raise it and measure the time taken for the bucket to reach the maximum boom height. 2. Boom LOWER time Set the bucket horizontal, then lower the boom from the maximum height and measure the time taken for the bucket to reach the lowest position from the ground. 3.
Bucket DUMP time Raise the boom to the maximum height, and measure the time taken to move the bucket from the tilt position (bucket fully tilted back) to the dump position ( bucket fully tipped forward). 4. Bucket TILT time 1) Raise the boom to the maximum height, and measure the time taken to move the bucket to the tilt position (bucket fully tilted back). 2) Set the bucket horizontal to the ground and measure the time taken to move the bucket from the horizontal position to the tilt position (bucket fully tilted back). 20-48