Komatsu — INSTALLATION

DISASSEMBLY AND ASSEMBLY TORQUE CONVERTER CHARGING PUMP TORQUE CONVERTER CHARGING PUMP Warning! Stop the machine on level ground and install the safety bar on the frame. Lower the bucket to the ground and stop the engine. Then apply the parking brake and put blocks under the wheels to prevent the machine from moving. REMOVAL 1. Covers Remove cover (1) at bottom of cab, transmission inspection cover (2), and side inspection cover (3). 2. Hydraulic piping Disconnect following hydraulic piping. Disconnect tube (4) between filter and pump from pump. Disconnect tube (5) between pump and power master cylinder from pump. Disconnect tube (6) between transmission strainer and pump from pump. 3.

Torque converter charging pump Sling pump (7), then remove mounting bolts, and remove torque converter charging pump (7). i Carry out the removal operation with two workers. Torque converter charging pump: 13 kg INSTALLATION ! Carry out installation in the reverse order of removal. Check that there is an O-ring fitted at the mating surface with the housing. 30-29 WA250-3L