DISASSEMBLY AND ASSEMBLY DIFFERENTIAL 4) Loosen 4 mounting bolts at bevel gear end until there is axial play at bearing. 5) Tighten 4 mounting bolts uniformly again. Mounting bolts: 3.9 Nm (0.4 kgm) Ъ When doing this, check that there is axial play at the bearing, and rotate the bevel gear when tightening. 6) Using a feeler gauge at 2 places in groove of bearing carrier (7) at bevel gear end, measure clearances T and T 1 2. 7) Selecting shims Shim thickness = (T + T )/2 ± 0.035mm 1 2 Ъ Combine the following shims to give the necessary shim thickness. 0.07 mm, 0.20 mm, 0.30 mm, 0.80 mm) 8) Remove left and right bearing carriers (7), and assemble selected shims (32).
Ъ Rotate the bevel gear and tighten the mounting bolts of the bearing carrier uniformly. Mounting bolts: 112.8 ± 9.8 Nm (11.5 ± 1.0 kgm) 9) Using a spring balance, measure preload of bevel gear and check that it is within specified range. ! Preload: 7.4 - 23.5 N (0.75 - 2.4 kg) ! If the preload is not within the specified range, change the shim thickness to adjust. 7. Cage 1) Assemble O-ring (34) in bearing cage. O-ring: Oil (axle oil) 30-121 WA250-3L