. MAINTENANCE SERVICE PROCEDURE REPLACEMENT OF CHEEK PLATE 4 - 45 1. Take a special tool for hanging Tool N o. 16) out of the tool box. 2. Remo ve the cheek plate upper g uard, using this special tool. [Chee k plate upper guard weight 3. Remo ve soils, sand, etc. from t he hanging hole of the upper cheek plate with compressed air or a wire brush, then lift up the upper cheek plate with the speci al tool. 0 kg (234 lb)] he hanging hole of the lower [Uppe r cheek plate weight: 106. 4. Remo ve soils, sand, etc. from t cheek plate with compressed air or a wire brush, then lift up the lower cheek plate with the speci al tool. g (159 lb)] [lower cheek plate weight: 72.0 k 5.
After r emoving all the cheek plate s, completely remove the soil and sa nd from the cheek plate fit ting surfaces (front, rear, right and le ft). In part icular, remove the soil and sand clogging both sides of the fix ed jaw. 6. Insert new cheek plates in order from the underside along the fixed j aw and a guide of the side frame. heek plates and cheek plate s (on one side) M24 x 4 bolts (on one side) 7. Tighte n the bolts securing the c guard. upper (1) Fo r cheek plate: M24 x 3 bolt (2) Fo r cheek plate upper guard: