OPERATIONAL PERFORMANCE TEST / Excavator Test SWING SPEED Summary: Measure the time required to swing three complete turns. Preparation: 1. Check the lubrication of the swing gear and swing bearing. 2. Place the machine on flat, solid ground with am- ple space for swinging. Do not conduct this test on slopes. 3. With the bucket empty, position the front attach- ment as follows: Backhoe: With the arm cylinder fully retracted, and the bucket cylinder fully extended, raise the boom so that the arm tip pin height is flush with the boom foot pin height. Loading Shovel:
With the arm cylinder and the bucket cylinder fully extended, raise the boom so that the arm tip pin height is flush with the boom foot pin height. The height as the boom foot pin height. T105-06-03-013 NOTE: In case of no place to be measured, meas- ure with the boom raised and the arm rolled-in. 4. Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). TBAR-04-04-001 CAUTION: Prevent personal injury. Always make sure that the area is clear and that co-workers are out of the swing area before starting the measurement. Measurement: 1. Measurement conditions are as below. 2. Operate swing control lever fully. 3. Measure the time required to swing 3 turns in one direction. 4.
Operate swing control lever fully in the opposite direction and measure the time required for 3 turns. 5. Perform the measurement three times and cal- culate the average values. Evaluation: Refer to the Performance Standard Table in Group T4-2. Remedy: Refer to the Troubleshooting B in Group T5-7. T4-4-5 The height as the boom foot pin height. Engine Control Dial Power Mode Switch Work Mode Auto-Idle Switch Fast Idle HP Mode Digging Mode OFF