OPERATIONAL PERFORMANCE TEST / Excavator Test SWING MOTOR LEAKAGE Summary: Check for upperstructure drift while suspending a load on a slope. Preparation: 1. Check the lubrication of the swing gear and swing bearing. 2. Load bucket fully. In lieu of loading the bucket, weight (W) of the following specification can be used. Backhoe: W=4650 kg (10300 lb) Loading shovel: W=6000 kg (13200 lb) 3. Position the front attachment as follows: Backhoe: With the arm cylinder fully retracted, and the bucket cylinder fully extended, raise the boom so that the arm tip pin height is flush with the boom foot pin height. Loading shovel:
With the arm cylinder and the bucket cylinder fully extended, raise the boom so that the arm tip pin height is flush with the boom foot pin height. 4. Park the machine on a smooth slope with a gra- dient of 26.8% (15 ° ). 5. Swing the upperstructure to position it 90 ° to the slope. Put the matching marks on the swing bearing periphery and track frame by using a tape, as illustrated. 6. Maintain the hydraulic oil temperature at 50 ± 5 ° C (122 ± 41 ° F). Measurement: 1. Measurement conditions are as below.: T105-06-03-011 Measure Difference Between Marks Mark on Track Frame Mark on Swing Bearing 2. Maintain the engine at slow idle.
After five min- utes, measure the difference between the marks along the swing bearing periphery and the track frame. 3. Perform the measurement in both right and left swing directions. 4. Perform the measurement three times and cal- culate the average values. Evaluation: Refer to the Performance Standard Table in Group T4-2. Remedy: Refer to the Troubleshooting B in Group T5-7. T105-06-03-010 T4-4-7 Power Mode Switch Work Mode Auto-Idle Switch HP Mode Digging Mode OFF