. OPERATION OPERATION OPERATING METHOD FOR RIPPING OPERATIONS BASIC OPERATING METHOD 3 - 150 (1) Point in conta ct with ground (2) Insert point to specified dep (3) Ripping (4) Start raising r (5) Shank tilted b (6) Start lowering TRACK OF RIPPER SHANK as follows, passing through the points shown in the diagram above. Carry out the rip ping operation as follows, p assing through the points shown in t he diagram a bove. (1) Tilt the ripper back, lower th e ripper poin t to the ground t hat the pla ce to begi n ripping, and raise the rear o f the machine.
(2) To press the d ecelerator ped al and lowe r the eng ine speed, s et the speed ran ge to F1, and t ilt the ripper to in sert the point to th e specified de pth. es the specified depth, raise the engine speed to full speed and travel forward. ripping. when the shank is tilted, change the shank mounting hole to the hole below and travel forward, raise the shank from the bed rock, then travel in reverse. (3) When the rip per point reach es the specified dep th, raise the engin e speed to full speed an d travel f orward Tilt the shank and carry out If t he circuit i s relieved even reduce the rip ping depth.
(4) After complet ing the ripping, travel forward, rais e the shank from t he bed roc k, then travel in reverse (5) While travelin g in reverse, tilt the ripper back, and when the starting point for the ripping is reached, lower the lt the ripper back, a nd when the starti ng point for s reached , lower the ripper. hole below and