. OPERATION OPERATION OPERATION OPERATION 3. Tighten set bolt (1). ADJUSTING RIPPER to (Unit: mm (in)) Judgment standard NO. Item dimension Wear limit Action Basic (1) Wear of point (a) 335 (13.2) 225 (8.9) Replace 3 - 160 NOTICE he joints of the brace ( l ) is 1292 mm (4 The standard distance between t 3 in), but make sure that the maxi mum tilt does not exceed 400 mm (15.8 i If the tilt exceeds 400 mm (15.8 in ), there will be excessive force brought bear on the parts, so do not use with a tilt of more than 400 mm (15.8 in ADJUSTING DIGGING DEPTH There are mounting holes in t he shank to chose to match the ri pping depth.
Normally, use the bottom hole particularly deep ripping is ne eded, use the top hole. epth, do as follows. n the tip of pin (1), then hit with a he opposite side. ge the position of the shank hole. and then knock it in with a hammer. when inserting, insert it partially by with a hammer. installed, use the pin puller. OD OF OPERATING PIN PULLER When changing the digging d 1. Place a pointed object o hammer to remove from t 2. Remove pin (2) and chan 3. Insert pin (1) partially by h The pin is one unit, so hand, then knock it in When a giant ripper is For details, see "METH (PAGE 3-149)". 1. Place a pointed object o 2. Remove pin (2) and chan 3.
Insert pin (1) partially by h and then knock it in with a hamme REPLACING POINT AND PRO TECTOR e the point and protector installed y are worn. To protect the shank, replac the tip of the shank when the Put a pin removal bar in conta ct with the pin marked by the arro then hit it with a hammer and remove it from the opposite side.