. MAINTENANCE SERVICE PROCEDURE ADJUSTING IN VERTICAL DIRECTION adjustment). 4 - 32 1. To d etermine t he amount of adjustm ent, measure clearan ce B, then subtract Exampl If cle arance B Amount of adj ustment = 5 - 2 = 3 m 2. Loosen bolts (9 ) (inside, outside: To tal 4) to a point where t here is no more rea ction from the spring . tal 8) . When doing this, do 3. Loosen bolt (1 ) (inside, outside: To not l oosen it m ore than 3 turns. 4. Usin then g a bar, pu remove ll up up-down guide shims of a thicknes (5) to set clearance C s equal to the amou to 0, nt of 5. adjustment me After removing (Left, right, ins When doing th asured in Step 1. shims (7), add them ide, outside:
Total 8 is, check that the tot on top of shim (8). places) al thickness of shim (7) and shim (8) is t adjustment at he same after adju all places. ims or adding shim built-in spring. stment as it was before s will result in improper Discarding sh function of the REMARK There ar e two type s of shim thickness: 1 mm (0.039 in) and 2 mm (0.079 in ).