Cylinder Head and Valves Torque-Turn Rocker Arm Hold-Down Clamp Cap Screws on Engines with Single Rail Fuel Systems 1. After applying initial torque of 30 (22 lb-ft), start at front cap screw and proceed to the rear and torque-turn each cap screw 90 ° + 10 ° 0 ° as follows: 02 020 66 Using an oil proof pen, pencil, or marker, draw a line (A) parallel to the crankshaft across the entire top of each cap screw head. This line will be used as a reference mark. Install ratchet/socket on cap screw with ratchet handle parallel (B) to crankshaft. Tighten each cap screw 90 ° so ratchet handle is perpendicular (C) to crankshaft.
Remove ratchet/socket from cap screw and verify line on top of cap screw is perpendicular to crankshaft. RG10281 –UN–20AUG99 Index Rocker Cap Screw NOTE: If cap screw is tightened beyond aligning mark, loosen cap screw and repeat procedure starting with initial torque of 30 (22 lb-ft). Repeat procedure on remaining cap screws and torque-turn cap screws to the following specifications. RG10282 –UN–20AUG99 Specification Rocker Arm Shaft Hold-Down Clamp Cap Screws (Single Rail Fuel System)—Final Torque-Turn 90 ° + 10 ° 0 ° ..................................... Ratchet Parallel to Crankshaft IMPORTANT: Position electronic unit injector wiring harness so that wires DO NOT touch rocker arms. 2.
Install unit injector wiring harness. Apply LOCTITE 222 (TY24311) Thread Lock and Sealer (Low Strength) to harness cap screws. Tighten cap screws to specifications below. RG10283 –UN–23SEP99 Specification Unit Injector Wiring Harness Bracket-to-Rear of Head—Torque 25 (18 lb-ft) .................................. Ratchet Perpendicular to Crankshaft A—Line on Rocker Cap Screw Head B—Ratchet Parallel to Crankshaft C—Ratchet Perpendicular to Crankshaft CTM100 (06APR04) 02-020-66 P OWER T ECH 10.5 L & 12.5 L Diesel Engines LOCTITE is a registered trademark of Loctite Corp. Continued on next page RG,RG34710,97 –19–01NOV00–7/9 040604 PN=138