. OPERATION OPERATION OPERATING METHOD FOR RIPPING OPERATIONS BASIC OPERATING METHOD (1) (2) (3) Start lowering ripper Point in contact with ground Insert point to specified depth (4) (5) (6) Ripping Start raising ripper Shank tilted back TRACK OF RIPPER SHANK Carry out the ripping operation as follows, passing through the points shown in the diagram above. (1) Tilt the ripper back, lower the ripper point to the ground that the place to begin ripping, and raise the rear of the machine. (2) To press the decelerator pedal and lower the engine speed, set the speed range to F1, and tilt the ripper to insert the point to the specified depth.
(3) When the ripper point reaches the specified depth, raise the engine speed to full speed and travel forward. Tilt the shank and carry out ripping. If the circuit is relieved even when the shank is tilted, change the shank mounting hole to the hole below and reduce the ripping depth. (4) After completing the ripping, travel forward, raise the shank from the bed rock, then travel in reverse. (5) While traveling in reverse, tilt the ripper back, and when the starting point for the ripping is reached, lower the ripper. REMARK If the ripper is applied with the rear of the machine raised from the ground, the drawbar pull will be low, so the ripping efficiency will be reduced.
If the ripping depth is kept constant, there will be no unevenness, and this will increase the efficiency of the dozing operation. (A)Length of track on ground 3 - 151