. OPERATION OPERATION OPERATION OPERATION and carry out ripping. 3 - 153 Cross ri On jo bsites with hard bedroc k, for rocks a nd boulders w hich are impossible to break o r dig up with one ripp ing pass, carry out the seco nd rippi ng pass at right angles to the first ripping di rection. At th a cro e edge of cliffs, ss direction, ma where it ke the is impossibl space betwe e to apply the r en the shanks ipper in smaller Durin g the ri pping op eration , if there is a ny hard bedroc k, carry out ri pping i n the op posite d irection to th e directio n wh ere the rippe r was a pplied.
If it is st ill impossible to break up t he rock, break Whe up the n carryi area ar ng out c ound the bedrock a l oncentrated ripping ittle at the of hard b work efficien cy is hig h if the ripper is appl ied to the whole of the diggi ng face