. OPERATION OPERATION ADJUSTING RIPPER with a 3 - 158 ADJUSTING DIGGING D Mounting pin holes are provided in the shank and these are u sed according to the desired di gging depth . For no rma use, use the bottom ho le, and when particularly d eep diggin g is needed, use the To c hange the digging (Machines equipped wi 1. P lace a pointed ob ject on the tip of ammer to remove from the opposite side. 2. R emove pin (2) an d change the position of th e shank h 3. I nsert pin (1) partial ly by hand then knock it in with a ha mmer. The pin is made of one piece, so insert it partially by hand ith a hammer. per is installed, use the pin puller.
then knock it in w When a giant rip per is installed, use the pi For details, see " (PAGE 3-150)". METHOD OF OPERATING PIN PULLER LLER REPLACING POINT AN To p rotect the shank, if are w orn, replace them Plac e a pin remover on the pin marked by the arr ow, then h it with a hammer to remove fr REMARK The pin is a unitized ty pe, so insert the pin partia lly by hand , then knock i t in fully with a ha