. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE NOTICE 4 - 29 When inserting t he element, i f the rubber at the tip i s swollen or the outer element is not pu shed in stra ight, and cove r (3) is assembled by fo rce to hook (2), there i s danger th at the hook a cleane damaged, so be careful when assembling. 8.
I nsta ll cove r (3) as foll 1) A lign co ver (3) wit h the elemen 2) H ook t he tip of h ook (2) t o th leaner body and lock it in position 3) W hen l ocking hoo ks (2) in position, apply th e hooks i n turn n opposite sides (top, bottom, left, right) in the sam e way s whe n tightenin 4) W hen cover (3) clearance etwee n the air cle aner body a nd cove r (3) i s no t too l arge. it is to o large, in