Komatsu — EVERY 2000 HOURS SERVICE

. MAINTENANCE SERVICE PROCEDURE CHECK ENGINE VALVE CLEARANCE, ADJUST Special tools are required for removial and adjustment of the parts, have your Komatsu distributor perform this service. CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT) WARNING in the control circuit. Even work equipment to go down 4 - 82 The a ccumulator is charged with high-pre ssure nitrogen gas, so mistaken operation may cause an e xplosion, which will lead to seriou s injury or damage. When handling the accumulator, always do as follows. Th e pressure in the hydraulic circuit ca nnot be completely removed.

When remov ing the hydraul ic equipment, do not stand in t the he direction that the oil spurts out w hen carrying out the operation. In addition , loosen the bolt s slowly when c arrying out operation. not disassemble the accumulator. f it in fire. impact. Do Do not bring it near flame or dispose o Do not make holes in it or weld it. Do not hit it, roll it, or subject it to any Wh en disposing of the accumulator, t he gas must be released. Please contact y our Komatsu di stributor to hav e this work car ried out.

NOTIC E If the nitrogen gas charge pressure in the accumulator is low and operations are cont inued, it will be come impossible to release the re maining pressure inside the hydraul ic circuit if a failure occurs on the machine . FUNCTION OF ACCUMULATOR The a ccumulator stores the pressure after the engine is stopped, the contr the fo llowing actions are possible. If t he control lever is operated in th eq un uipment, it is possible for the der its own weight. Th e pressure in the hydraulic circ The a ccumulator is installed to the p on th e right.