Komatsu — 6.6.3.1 INSTALLING THE HAMMER

ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER 233 3 - Remove the plugs of the machine pipes and of the hammer flexible pipes. Use 32, 36, 38 and 41 mm hexagon spanners. 4 - Connect the right pipe to the coupling (1) and the left pipe to the coupling (2), making sure that the sizes of the pipe fittings are as required. STANDARD ARM 1"7/16-12 ORFS 1 RWA29280 CAUTION CAUTION • When connecting the pipes, take care to prevent any im- purities from getting into them. RWA29280 5 - Start the machine and raise the demolition hammer position- ing it vertically.

6 - Stop the machine again and lubricate the joints (See “4.5.1 LUBRICATION DIAGRAM”) and the hammer (see the specif- ic operation and maintenance manual). 7 - Before starting work, check the tightness of the circuit. TELESCOPIC ARM 1 1"7/16-12 ORFS RWA29290 DANGER • Always wear thick gloves and safety goggles during this check. • To check the system for leaks, use a piece of cardboard or a wooden board. STANDARD ARM 2 1"3/16-12 ORFS RWA29300 TELESCOPIC ARM 1"3/16-12 2 ORFS RWA29310 TELESCOPIC ARM 1"3/16-12 ORFS 2 RWA29310 RWA29310 TELESCOPIC ARM 1"7/16-12 ORFS 1 RWA29290 RWA29290 STANDARD ARM 1"3/16-12 ORFS 2 RWA29300 RWA29300