Komatsu — 6.6.5 MAINTENANCE

ARRANGEMENT FOR THE INSTALLATION OF THE DEMOLITION HAMMER 6.6.3.2 REMOVING THE HAMMER To remove the hammer, proceed as follows: 1 - Stop the engine and move the hydraulic controls in all directions, in order to completely release the residual pressures present in the circuits of the machine. 2 - Press the hammer control pedal to release the pressure present in the hammer delivery pipe. 3 - Disconnect the hammer delivery and return pipes. Use 32, 36, 38 and 41 mm hexagon spanners. 4 - Fit the pipe sealing plugs complete with the relevant gaskets.

DANGER Make sure that the plugs are properly tightened and that there are no leakages; if the circuit is inadvert- ently pressurized, small leakages can be turned into thin jets that may perforate the skin or injure the eyes. Always wear thick gloves and safety goggles to carry out this check. To check the system for leaks, use a piece of cardboard or a wooden board. 5 - Disconnect the hammer from the mechanical constraints, as described in “3.13.5 CHANGING THE BACK- HOE BUCKET”. 6.6.4 USING THE HAMMER If the machine is provided with telescopic arm, this must be kept only folded.

6.6.5 MAINTENANCE The hydraulic system does not require any maintenance operation and inspection other than those prescribed for the machine. For the maintenance operations required by the hammer, see the specific operation manual. 234 See the specific manual. OPERATIONS WITH THE HYDRAULIC HAMMER AND COMPACTING TOOLS CAUTION CAUTION