Komatsu — Komatsu K EAM04 9 700 T Operation and Maintenance Manual for Bulldozers

OPERATION OPERATION 5. After warm-up run is completed, check gauges and caution lamps for proper operation. If any abnormality is found, repair it. q Continue to run the engine at light load until engine coolant temperature gauge indicator (2) and Hydraulic oil temperature gauge (3) fall within the green range (B). (A): White range (B): Green range (C): Red range REMARK If the oil temperature in the power train is not raised properly, it will take longer to accelerate to the maximum speed. 6. Check for abnormal exhaust gas color, noise, or vibration. If any abnormality is found, contact your Komatsu distributor. 3-96