Kaiyi BR380JG-1E0 — PREPARATION WORK FOR TROUBLESHOOTING FOR ELECTRICAL SYSTEM

SEN02305-01 30 Testing and adjusting Preparation work for troubleshooting for electrical system 2. Engine controller 1) Open the engine hood. a The engine controller is mounted on the engine. 2) Insert or connect troubleshooting T-adapt- ers in or to connectors CE01 , CE02 , and CE03 of engine controller (3). a Connectors CE01 and CE02 are fixed with screws. When disconnecting them, loosen the screws. a When returning connectors CE01 and CE02 , tighten the screws to the spec- ified torque.

a When carrying out troubleshooting for an elec- tric circuit related to the machine monitor, engine controller, pump controller and KOMTRAX terminal controller, expose the related connectors according to the following procedure. a Since the machine monitor, engine and pump controller and KOMTRAX terminal are installed inside main panel (1), remove the 7 main panel mounting screws and open the main panel first. 3 Screw: 3 ± 1 Nm {0.3 ± 0.1 kgm} 3. Pump controller Insert or connect test T-adapters to connectors C01 , C02 , and C03 of pump controller (3). a Since the connectors are fixed with screws, loosen those screws before dis- connecting the connectors.

a When returning the connectors, tighten the screws to the specified torque. 1. Machine monitor Insert or connect test T-adapters to connectors P01, P02, and P03 of machine monitor (2). 3 Screw: 2.82 Nm {0.288 kgm} 56 BR380JG-1E0