U.S. Department of Defense MIL-HDBK-704-3 — NOT MEASUREMENT

Downloaded from https://www.everyspec.com MIL-HDBK-704-3 4. Test setup. Configure the test setup as shown in figure TAC303-1. Measurements, except current, must be made within 10 cm of the input power terminals of the UUT. 5. Compliance test. With the power source off, install the UUT and the stimulation and monitoring equipment into the test setup of figure TAC303-1. Turn on the power source and adjust the voltage to the nominal steady state voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz. Energize the UUT. Allow sufficient time for the UUT to warm up.

Conduct a performance test of the UUT according to the utilization equipment performance test procedures to verify that the UUT is providing specified performance for abnormal aircraft electrical conditions. 5.1 Compliance test for MIL-STD-704A. The UUT must be subjected to the frequency transients for each test condition A through E noted in table TAC303-II. The frequency must increase or decrease from steady state frequency to the frequency transient level over the duration noted; the frequency must remain at the frequency transient level for the duration noted; and the frequency must return from the frequency transient level over the duration noted.

For test condition E, an underfrequency transient of 320 Hz is immediately followed by an overfrequency transient of 480 Hz. For each test condition, monitor the performance of the UUT during the frequency transient according to the equipment performance test procedures to verify that the UUT is providing specified performance for abnormal aircraft electrical conditions. Repeat each test condition 5 times. After the power returns to normal limits, conduct a performance test of the UUT according to the utilization equipment performance test procedures to verify that the UUT is providing specified performance for normal aircraft electrical conditions, and has not suffered damage.

Record the steady state voltages, steady state frequency, frequency transient level, time at frequency transient, oscilloscope trace (Hz vs. time), and the performance of the UUT for each test condition in the data sheet shown in table TAC302-IV. Repeat for each mode of operation of the UUT. 5.2 Compliance test for MIL-STD-704B, C, D, E, & F. The UUT must be subjected to the frequency transients for each test condition AA through EE noted in table TAC302-III.

The frequency must increase or decrease from steady state frequency to the frequency transient level over the duration noted; the frequency must remain at the frequency transient level for the duration noted; and the frequency must return from the frequency transient level over the duration noted. For test condition EE, an underfrequency transient of 320 Hz is immediately followed by an overfrequency transient of 480 Hz. For each test condition, monitor the performance of the UUT during the frequency transient according to the equipment performance test procedures to verify that the UUT is providing specified performance for abnormal aircraft electrical conditions.

Repeat each test condition 5 times. After the power returns to normal limits, conduct a performance test of the UUT according to the utilization equipment performance test procedures to verify that the UUT is providing specified performance for normal aircraft electrical conditions, and has not suffered damage. Record the steady state voltages, steady state frequency, frequency transient level, time at frequency transient, oscilloscope trace (Hz vs. time), and the performance of the UUT for each test condition in the data sheet shown in table TAC303-V. Repeat for each mode of operation of the UUT. 96