Downloaded from https://www.everyspec.com MIL-HDBK-704-3 voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz. Energize the UUT. The UUT must remain for a length of time that confirms the utilization equipment is not damaged and does not cause an unsafe condition due to phase sequence reversal and should be not less than thirty (30) minutes. Record the steady state voltages, steady state frequency, time duration at phase sequence reversal test condition, and the performance of the UUT in the data sheet shown in table TAC603-II.
With the power source off, install the UUT and the stimulation and monitoring equipment into the test setup of figure TAC603-2 (correct phase sequence of A-B-C). Turn on the power source and adjust the voltage to the nominal steady state voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz. Energize the UUT. The UUT must remain for a length of time that confirms the utilization equipment was not damaged and does not cause an unsafe condition after the phase sequence reversal and should be not less than thirty (30) minutes.
Conduct a performance test of the UUT according to the utilization equipment performance test procedures to confirm that the UUT has returned to the performance specified for normal aircraft electrical conditions and has not suffered damage. Record the steady state voltages, steady state frequency, time duration at test condition, and the performance of the UUT in the data sheet shown in table TAC603-II. Repeat for each mode of operation of the UUT. 117