Downloaded from https://www.everyspec.com MIL-HDBK-704-3 electrical conditions. Record the steady state voltages, steady state frequency, voltage transient level, time duration at voltage transient, oscilloscope trace, and the performance of the UUT for each test condition in the data sheet shown in table TAC109-V. Repeat for each mode of operation of the UUT. In addition, for MIL-STD-704B, C, D, E, & F test compliance perform the repetitive normal voltage transient test as described in 5.3. 5.3 Repetitive normal voltage transients test.
Program the power supply to provide a continually repeating voltage transient that decreases from 115 Vrms to 90 Vrms in 2.5 msec, then increases to 140 Vrms over 50 msec, then decreases to 115 Vrms over 5.0 msec. The voltage transient is repeated every 0.5 seconds, see figure TAC109-2. The UUT must be subjected to the repetitive voltage transient for a length of time that confirms the utilization equipment can continuously operate and should be not less than thirty (30) minutes. Conduct a performance test of the UUT according to the utilization equipment performance test procedures to verify that the UUT is providing specified performance for normal aircraft electrical conditions.
Record the steady state voltages, steady state frequency, high voltage transient level, low voltage transient level, oscilloscope trace, time duration at test condition, and the performance of the UUT in the data sheet shown in table TAC109-IV or table TAC109-V. Repeat for each mode of operation of the UUT. After all test conditions are complete, adjust the voltage to the nominal steady state voltage of 115 Vrms (line-to-neutral) and adjust the frequency to the nominal steady state frequency of 400 Hz.
Conduct a performance test of the UUT according to the utilization equipment performance test procedures to confirm that the UUT has not suffered damage and is providing specified performance for normal aircraft electrical conditions. 50