Downloaded from https://www.everyspec.com MIL-STD-100E NOTICE 2 a. Description in the revisions block b. Zone in the zone column within the revisions block. c. Revision authorization document referenced in the revisions block. d. Revision symbols on the field of the drawing. e. Combinations of (a), (b), (c) and (d) as required for clarity. 602.2 Revision symbols. Revision symbols shall not be used on drawings in book-form, artwork master of undimensioned drawings and schematic or wiring diagrams where the use of such symbols may conflict with other symbols as used on these kinds of drawings. 602.3 Revision letters. Upper case letters shall be used in alphabetical sequence.

The letters “I”, “O”, “Q”, “S”, “X” and “Z” shall not be used. When revisions are numerous enough to exhaust the alphabet, the revision following “Y” shall be “AA”, and the next “AB”, then “AC”. etc. Should “AA” to “AY” be exhausted, the next sequence shall be “BA”, “BB”. Revision letters shall not exceed two characters. Release (initial issue) of a drawing does not constitute need for a revision letter and may be indicated by the use of a dash (–). See Figure 500-6.” 602.4 Multiple Change. All changes to a drawing authorized by a given revision authorization document shall be incorporated at the same time.

All changes to a drawing incorporated at one time shall be identified by the same revision letter if the revision letter is assigned at the time the changes are incorporated. The changes may be numbered sequentially to permit ready identification of a specific change. In this case the appropriate sequence number will appear as a suffix to the revision letter in the field of the drawing. Revision authorization documents that are assigned individual revision letters shall be incorporated individually as separate revisions (in proper sequence) to the drawing. 602.5 Additions. When a multi-sheet drawing is revised to add a new sheet(s), the note.

“THIS SHEET ADDED”, shall be placed in the revisions block of the new sheet(s), in addition to other notations. See FIGURE 600-1”. If a revisions block is not included on the new sheet, the indication that a new sheet was added to the drawing shall be recorded on sheet 1. See 604.2. 600-2 Supersedes page 600-2 of 30 March 1992