Downloaded from https://www.everyspec.com TOP 1-2-621 6 February 2009 For the combined sand and dust test procedure, dust concentration levels may need to be reduced due to equipment limitations. Certain screw type auger designs cannot pick up all of the fine particle dust to feed the injection system (i.e., there may not be enough large particles in the mixture to carry the dust forward through the pipe). Additionally, blowing wind speed differences (sand is double the speed of dust - see paragraph 1.b(5)) affects the particle impact velocity and particle impact distribution across the face of the UUT.

Lastly, extra personnel safety precautions shall be taken on account of the large quantity of dust. b. Determine the sand and dust particle size distribution and concentrations required to meet the test specification. Appendix A provides a brief comparison of the various mixtures utilized in previous tests at White Sands Missile Range. The sand/dust particle size may be characterized using the method outlined in Appendix B. 4.2 Test Conduct. a. Sand Test. Visually inspect, photographically document, and functionally test the UUT prior to starting the exposure.

The test article shall be subjected to blowing sand conditions for a total of 360 minutes (90 minutes per side) at an air velocity of 18 m/s (40 mph), with the most vulnerable side of the test article exposed last. Conduct the test as follows: (1) Record ambient weather conditions. Ensure ambient wind speeds are below 4.5 m/s (10 mph) with occasional gusts up to 7 m/s (15 mph) and relative humidity is under 30%. If humidity is higher, ensure the sand material is relatively dry (e.g., bake it before test) in order to avoid caking in the sand injection system. Reschedule the test if conditions are not acceptable. (2) Adjust the sand injection system to the required sand concentration level.

This is normally done by operating the system for a short duration (one minute), collecting the material output and weighing it. Parameters for two different test configurations are shown in Appendix A, Table A-2. (3) Validate the air speed with a hotwire anemometer or equivalent device at the location where the UUT is to be placed. The UUT is usually setup at a distance of 3 to 4 m (10-15 ft) from the wind machine outlet. This helps to provide better sand distribution across the face of the UUT and ensures that the sand particles have reached their terminal velocity.

Perform a full system test run to verify the injection system is working properly; i.e., sand is being equally distributed across the test area. (4) Place the first face of the UUT at the selected distance from the wind machine. If required, instrument the UUT with thermocouples and record temperatures for the duration of the test. Ground the UUT to avoid the buildup of electrostatic charge. (Disregard grounding if static electricity discharge effects are data points of user concern in final fielding and take careful attention, after test exposure, to closely monitor and record post test discharge effects that occur when test item is first handled for functional checks. This may include:

loss of cryptographic variables, loss of configuration settings to serial/parallel data communications ports, etc. Evaluations of these effects should include user consideration aspects for potentials of causing mission critical failures in performance.) 8