US Army Developmental Test Command TOP 1-2-622 — Test Setup #1

Downloaded from https://www.everyspec.com TOP 1-2-622 11 September 2009 APPENDIX D: VEMP Ordnance Test Information Provided are some example procedures for VEMP testing of materials and equipments which contain ordnance. 1. Most facilities will not allow the presence of full up ordinance during any type of electromagnetic testing and this includes VEMP. The types of systems which contain ordinance and require VEMP testing are those which are electrically controlled and actuated and not mechanically actuated. These systems utilize Electrically Initiated Devices (EIDs) to perform explosive train functions, such as initiating the battery, arming the device etc.

In order to perform a VEMP assessment on a system that uses these EID, the main charge requires replacement with inert material and the testing needs to be performed on two system configurations; a. The first and foremost configuration (i.e. TYPE 1 ) is the EIDs are replaced with an equivalent resistor and a current probe. The equivalent resistor provides the same impedance to the system under test and the current probe is routed such that the measurement of the induced current can be recorded by and external DAS system. In all ordinance systems the safety margin of the explosives with respect to the environment are of upmost importance.

The VEMP EID induced current measurement is used in performing safety margin calculations based on the EID specifications. b. The second configuration (i.e. TYPE 2 ) is with the main charge removed and the EIDs installed. Safety procedures must be developed and strictly followed to insure that projectiles are not created should the EID function which could injure personnel or damage the facility or equipment. Potential for damage with only the EIDs installed usually is provided in the System Safety Assessment Report (SSAR).

In some case the statement will be directly made that the functioning of the EID cannot deform the surface or create projectiles, in other cases the indication could be that the item requires enclosure in a plastic or plywood (i.e. non-conductive container for VEMP) of a specific thickness to insure that possible projectiles are contained. There must also be a method of determining if the EID has functioned. The test configuration is the basic GO-NO-GO configuration and provides an indication as to whether the calculations and measurements from the first configuration were correct. 2. EID specifications contain valuable pieces of data. The first is the device maximum no-fire current (i.e.

the EID will not function with the continuous application of 20mA). The second is the device all fire current (i.e. the EID will function with the application of 1A). And the third is the timing for the EID to function (i.e. some will indicate a square pulse with an amplitude and a time and others may indicate all EIDs will fire within 10 milli-seconds when a 103.4 µ -Farad capacitor charged to 1.6 Volts is discharged through the EED.) From these specifications two important VEMP parameters are determined. The first is that for the best case the VEMP induced current regardless of time is less than the no-fire current.

And the second is that the VEMP induced energy should provide for a minimum safety factor of 16.5 dB. D-1