4.8 Test Run Checklist 4.8 Test Run Checklist Review the checklist before performing a test run. Check each item that applies. Start-Up Programming & Operation Check the items that correspond to the control mode being used. WARNING! Ensure start/stop and safety circuits are wired properly and in the correct state before energizing the drive. Failure to comply could result in death or serious injury from moving equipment. When programmed for 3-wire control, a momentary closure on terminal S1 may cause the drive to start. OYMC TOEP C71060622-01-OY V1000 User Manual 167 No. Checklist Page 1 Thoroughly read the manual before performing a test run. 2 Turn the power on.

149 3 Set the voltage for the power supply to E1-01. 133 4 No. Checklist Page V/f Control (A1-02 = 0) 4 Select the best V/f pattern according to the application and motor characteristics. Example: If using a motor with a rated frequency of 50.0 Hz, set E1-03 to “0”. 135 5 Perform Auto-Tuning for Energy Savings if using Energy Saving functions. 151 Open Loop Vector Control (A1-02 = 2) 6 Uncouple the load from the motor when performing Rotational Auto-Tuning. 149 7 Perform Rotational Auto-Tuning. 153 8 The following data entered during Auto-Tuning should match the information written on the motor nameplate:

motor rated output power (kW) → T1-02 rated voltage (V) → T1-03 rated current (A) → T1-04 base frequency (Hz) → T1-05 number of motor poles → T1-06 motor rotations per minutes (r/min) → T1-07 156 PM Open Loop Vector Control (A1-02 = 5) 9 Set permanent motor parameters E5-01 through E5-24 106