Fig. 3-3. Machine foundation layout 3.5.3 PERIODICAL CHECKS OF MACHINE LEVELING Exercise periodical checks on machine longitudinal and cross levelling and adjust if necessary, as following: In a 3 months periods for machine installed by foundation bolts Every months for machine installed directly on the floor. Note: Please have in mind that correct machine installation and levelling is very important condition for machine operation and accuracy of machining. 3.6 CONNECTION TO MAINS Warning : Only qualified electro technician may perform connection works after reading and understanding this manual. When connection the machine to mains following measures should be observed:

C:\Users\ELENA\Desktop\UL_C8C_325_ENG.doc 20/67 Distance between centres(DBC) А В 750mm 844 2194 1000mm 1150 2500