5 MACHINE LUBRICATION 5.1 GENERAL Warning: This machine is shipped from factory WITHOUT OIL in gearbox, feed box and apron. Therefore, before machine start up gearbox, feed box and apron must be fill up with oil. All other machine parts must be also lubricated in compliance with the instructions in this section, Table 5-1 “Recommended lubricants” and Diagram 5-1 “Machine lubrication”. 5.2 GEARBOX LUBRICATION 5.2.1 GEARBOX LUBRICATION METHOD Spindle system, gears and other mechanisms in the gearbox lubrication method is oil bath splashing. 5.2.2 FILLING THE GEARBOX WITH OIL 5.2.3. OIL LEVEL The oil level should be maintained in the middle of oil level indicator glass. 5.2.4.
OIL LEVEL VERIFICATION AND OIL ADDITION Before every machine start and 10 – 15 minutes after machine shut down verify the oil level on the oil level indicator glass. If necessary, add oil to the middle of oil indicator glass. Warning: Do not operate the machine if the oil level is below middle of oil level indicator glass. Also avoid excessive oil in the gearbox (over the middle of oil level indicator glass). 5.2.5. GEARBOX OIL CHANGE Hint: To avoid oil splash when drain the oil from gearbox it is recommended to prepare o find suitable a chute of 1000 mm length.
When oil drain put one side of the chute just under the gearbox drain hole while other end over a waste oil container or bucket Recommended periods for gearbox oil change: First change: 10 – 15 workdays after machine start up. Second change: 20-30 workdays after first change. Then: in a 2 -3 work months periods. Hint: It is recommended that before fill new oil wash the gearbox with suitable washing liquid commercially available. C:\Users\ELENA\Desktop\UL_C8C_325_ENG.doc 35/67 Lathe model C8С CU325 Oil viscosity grade CL32 acc. DIN51502 or CB32 acc. ISO3498-1979 (See Table 5-1) Quantity 1.25 Litre 1.25 Litre