Cummins — TURBOCHARGER MOUNTING NUTS

SECTION 2 Page 40 10 When the water becomes completely clean, stop the engine, close drain valve (3) and plug (4) 11 Replace the corrosion resistor (coolant filter) cartridge and corrosion resistor (coolant filter) valve (1) (See EVERY 250 HOURS SERVICE) 12 Supply water up to the vicinity of the water filler. 13 Run the engine for 5 minutes at low idling to eliminate air trapped in the cooling system, and run the engine for 5 minutes at high idling. (Leave water filler cap (2) off during this operation.) 14 Stop the engine and 3 minutes later supply water again up to vicinity of the water filler and tighten water filler cap.

15 Remove radiator level sensor (6), supply water through the sensor hole and fit the sensor. * Tightening torque of the sensor. 28 + 3 kgm 16 Drain the cooling water inside sub-tank (5), then clean the inside of the sub-tank and fill again with water to a point between the H and L lines. A WARNINGI Do not remove the cap 1 I : while cooling water is hot. Hot water may spout out. When removing radiator cap, lift the lever lo relieve inner * Drain and replace the mixture every 2 years, or 6000 hours of operation, whichever occurs first WHEN REQUIRED TURBOCHARGER MOUNTING NUTS Check the turbocharger mounting nuts annually Tighten the mounting nuts. Mounting nuts: 6 9 kgm