Detroit Diesel — Print Preview - C:\DOCUME~1\llakso01\LOCALS~1\Temp\.aptcache\S600507006\S600507

2.4 N2 FUEL INJECTOR TUBE AND O-RING 4. Install the EUI hold-down clamp and bolt it in place over J–33880–4 (part of tool set J–33880). See Figure 2-19. Figure 2-19 Installing N2 Injector Hold-down Clamp 5. Torque the EUI hold-down clamp bolt 58-66 N·m (43-49 lb·ft). This will seat the injector tube at the desired depth.After an injector tube has been installed in a cylinder head, it must be finished. Perform the following steps for a flaring injector tube: 6. Insert J–5286-6 (part of tool set J–33880), through the small hole in the bottom of the tube, rotating to engage the threads in the installation/removal tool. 7.

Using a torque wrench and 12-point, 29/32 in.socket, screw J–5286–6 (part of tool set J–33880) into J–33880–4 (part of tool set J–33880) until it begins to flare the tube. See Figure 2-20. Figure 2-20 Flaring Injector Tube Tip (Rev. 2005) All information subject to change without notice. 2-34 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION