Detroit Diesel — Print Preview - C:\DOCUME~1\llakso01\LOCALS~1\Temp\.aptcache\S600507006\S600507

SERIES 60 SERVICE MANUAL 2.19.3 Installation of PROM Perform the following steps for PROM installation: NOTICE: Any time a PROM is installed backwards, it will be destroyed upon applying power to the ECM. 1. Take the new PROM (already mounted in a carrier) out if its packaging, and check the part number, making sure it represents the PROM chosen to replace the one removed. 2. Position the new PROM and carrier squarely over the PROM socket with the small notched end of the carrier aligned with the narrow tab on the socket. The numeral one in a circle at the lower right corner of the PROM carrier should be installed in the same position as the numeral one located on the socket.

See Figure 2-105. Figure 2-105 Indexing PROM for Installation All information subject to change without notice. (Rev. 2005) 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION 2-167