Komatsu — EVERY 250 HOURS SERVICE

. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE 4 - 55 (5) Ripper tilt c ylinder bottom p in (2 place (6) Ripper lift c ylinder bottom p in (2 place (7) Ripper tilt c ylinder rod end pin (2 places) (8) (9) Ripper lift c Ripper arm ylinder rod pin (front) end (2 pl pin (2 aces) (10)Ripper arm pin (rear) (2 pl aces) The illustration on the right sho ws Giant R ipper (if equipped). (11 ) Equalizer bar side shaft (2 places (12 ) Suspensi on (equalizer ba r center shaft) (1 place) 1. Add greas e to th e s uspension (equalizer bar center shaft) through th e grease fitting o n the right side of the engine room 2. (marked w Pump the ith an arrow).

greasing lever u p and down 3 to 5 times.