US Army Developmental Test Command TOP 1-2-622 — REPORT DOCUMENTATION PAGE

Downloaded from https://www.everyspec.com TOP 1-2-622 11 September 2009 Table 2. Acceptable VEMP Instrumentation. The data acquisition system for the free-field tests should consist of transient digitizers with an operating bandwidth of 750 MHz, with a 1 Giga-sample per second sampling rate. Fiber optic data transmission system must be equal to the operating bandwidth. All utilized probes must be responsive to at least 1 GHz. Measurements of each illumination must be monitored by a B-dot probe (measures the time rate of change in the H-Field) or D-dot probe (measures the time rate of change in the E-Field) so that the magnitude of the E-field and pulse shape information is obtained.

This information should be digitized, analyzed, and stored for later detailed analysis. 2.3 VEMP Test Controls. These four criteria parameters and the SUT allowable down time must be thoroughly analyzed to ensure that acceptable facilities and appropriate instrumentation are utilized.

VEMP Parameter Units Parameter Tolerance Electric Field - E-field [volts/meter] ±5% Magnetic Field - H-field [amp-turns/meter] ±5% Rise Time [nanoseconds] ±5% Pulse Width [nanoseconds] ±5% Allowable Downtime [minutes] ±1 minute Performance criteria requirements of the test system include allowable downtime and recovery procedures, operate through, acceptable damage and degradation, re-boot, and the availability of and time required to implement repair and replacement parts. 3. REQUIRED TEST CONDITIONS. 3.1 Test Preparation. 3.1.1 Scope of Testing. Once a test program is initiated, the first concern of the TO is the establishment of the objectives and the scope of the VEMP program.

In essence, the following questions must be addressed: What equipment and support items are required? How must the equipment be tested in order to maximize determination of its performance? What test environment levels and at what assembly levels must testing occur? What data are required and how it will be collected, how must the information be processed and analyzed in order to obtain an accurate and complete survivability analysis of the test system and ultimately the system configuration to the criteria environment?

5 Measurement Parameter Preferred Device Measurement Accuracy Current Current Probes ±5% E-Field D-Dot Probe ±5% H-field B-Dot Probe ±5% Test Setup Digital Camera > 2 Megapixel